
The steps to the front door have been poured. They are covered with aggregate. We will do the same thing with the front porch.

The apron for the garage. ALSO: The door is in the extra garage.

Concrete forms are in for the back patio. We are waiting for the concrete.

The lighting fixtures in the master bathroom (
five?)
.
Looks funny with the front door covered up.
No comments:
Post a Comment